
Residences in Russafa · València
Thirty-eight homes around a planted courtyard, a few streets from the market.
Scroll
From €189,000
Handover autumn 2028


The project
A quiet building in warm stone, wrapped around a garden of olive and citrus. Deep terraces hold the summer shade, and the evenings stay outside.
Architecture by Estudio Brea · Developed by Norte Habitat


No corridors and no towers. Thirty-eight homes reached by open galleries around the courtyard, so every residence has light from two sides and a terrace that faces the sun or the garden — never a wall.
Homes
38
Storeys
7
Garden
310
m²

The residences
From a one-bedroom with a south terrace to three penthouses that share nothing but the sky. Twelve of thirty-eight remain.
Floor plans
Payment plan
Reserve with €6,000, spread part of the price over the build, and pay the rest when you collect the keys.
Every payment before handover is bank-guaranteed in your name (Ley 38/1999). Figures exclude 10% VAT and purchase costs.

Life at Alder

Gallery
Limestone floors, oak joinery and lime-washed walls — the palette is the same in every home.

01
Courtyard garden, ground floor

02
Corner living room, Type C

03
Kitchen and dining, Type B

04
Bathroom in honed travertine

05
Penthouse roof terrace, level 6

06
Living room and terrace, Type A

07
Gallery walkway, level 1
Location
Cafés, the covered market and the high-speed station within ten minutes’ walk. The beach is a flat ride along the Túria.
01
Mercat de Russafa
3
min walk
02
Estació del Nord
8
min walk
03
Joaquín Sorolla high-speed rail · Madrid in under 2 h
10
min walk
04
Jardí del Túria
11
min walk
05
Plaça de l’Ajuntament
12
min walk
06
Ciutat de les Arts i les Ciències
18
min walk
07
Malvarrosa beach
22
min bike
Construction
Structure at level 4 of 7 · 41% complete · Updated 30 September 2026
Mar 2025
Sep 2025
Jul 2026
Oct 2026
· Now
Mar 2027
Oct 2027
Jun 2028
Q4 2028

30 Sep 2026 · Structure
The structure has reached level 4 of 7. The level-5 slab is scheduled for 21 October, and façade stone samples are on site for the architects’ approval.

31 Jul 2026 · Foundations
Independent technical control approved the foundations and both basement levels. Parking and storage rooms are now fully enclosed.
Who builds it
Valencia-based developer founded in 2009. Builds mid-size residential buildings in central neighbourhoods, with one team running each project from permit to handover.
14
Buildings delivered
612
Homes handed over
13/14
On or before contract date
Practice founded in 2004 by Lucía Brea and Tomás Ferrer. Known for courtyard housing, passive shading and local stone, with every Alder 21 detail drawn in-house.
22
Years in practice
9
Housing projects in València
A
Projected energy rating

2023
Benimaclet · 24 homes · Handed over 6 weeks early

2021
Mestalla · 42 homes · Handed over on contract date

2019
Patraix · 31 homes · Handed over on contract date


Private visits · Monday to Saturday
Walk the 1:50 model, touch the stone and the oak, and stand on the site where your terrace will be. Our gallery is five minutes from Carrer de Sueca.
